Floor construction method

proimages/build/D/01/01.jpg

Step 1 Take the base diagonal

proimages/build/D/01/02.jpg

Step 2 Measure the level and place the gasket under the base

proimages/build/D/01/03.jpg

Step 3 Laying the bottom plate

proimages/build/D/01/04.jpg

Step 4 Standing board

proimages/build/D/01/05.jpg

Step 5 Covering the sky

proimages/build/D/01/06.jpg

Step 6 Apply the kelicon to the gap between the boards to avoid air leakage

proimages/build/D/01/07.jpg

Horizontal pedestal completed

Floor laying completed

proimages/build/D/01/08.jpg

Ceiling finish

proimages/build/D/01/10.jpg

finish

No floor construction method

proimages/build/D/02/01.jpg

Fix the horizontal piece under the U-shaped groove

proimages/build/D/02/02.jpg

Place the vertical plate in the U-shaped groove of the base

proimages/build/D/02/03.jpg

Covering the sky

proimages/IMG20200323180111-1.jpg

Apply the kelicon to the gap between the boards to avoid air leakage

Special site construction method

proimages/build/D/03/01.jpg

Pack column

proimages/build/D/03/05.jpg

Door window

proimages/build/D/03/06.jpg

Construction drawing

proimages/build/D/03/09.jpg

Pack column

proimages/build/D/03/07.jpg

Door window

proimages/build/D/03/08.jpg

Door window

Hanging beam

proimages/build/D/03/02.jpg

Hanging beam

proimages/build/D/03/03.jpg

Hanging beam

proimages/build/D/03/04.jpg

Hanging beam

Bottom insulation and waterproof

proimages/build/D/04/02.jpg

Construction drawing

proimages/build/D/04/03.jpg

Construction drawing

proimages/build/D/04/04.jpg

PS board insulation in the bottom plate

proimages/build/D/04/01.jpg

Construction drawing

Top